9 Air (AQ) Terminal Change at Guangzhou Baiyun Airport (CAN)
Effective on 15 January 2026
Guangzhou Baiyun International Airport (CAN) is commencing comprehensive upgrade and renovation work on Terminal 1 (T1). As a result, all 9 Air (AQ) flights will relocate from Terminal 1 to Terminal 2 at Guangzhou Baiyun International Airport.
Effective Date: 15 January 2026
New Bookings (from 31 December 2025):
All 9 Air (AQ) flights departing from or arriving at Guangzhou automatically display Terminal 2 (T2) in booking confirmations. No action is required.
Existing Bookings (made on and before 30 December 2025):
Previous ticket confirmations and SMS notifications show Terminal 1 (T1). These passengers must be notified of the terminal change to avoid confusion or missed flights.
Thank you for promptly notifying your passengers and ensuring smooth travel experiences.