9 Air (AQ) Terminal Change at Guangzhou Baiyun Airport (CAN)

Effective on 15 January 2026

Guangzhou Baiyun International Airport (CAN) is commencing comprehensive upgrade and renovation work on Terminal 1 (T1). As a result, all 9 Air (AQ) flights will relocate from Terminal 1 to Terminal 2 at Guangzhou Baiyun International Airport.

Effective Date: 15 January 2026

New Bookings (from 31 December 2025):

All 9 Air (AQ) flights departing from or arriving at Guangzhou automatically display Terminal 2 (T2) in booking confirmations. No action is required.

Existing Bookings (made on and before 30 December 2025): Previous ticket confirmations and SMS notifications show Terminal 1 (T1). These passengers must be notified of the terminal change to avoid confusion or missed flights.

Thank you for promptly notifying your passengers and ensuring smooth travel experiences.

Last updated

Was this helpful?